Full Definition
Lot coverage (often stated as maximum impervious surface ratio) limits the percentage of a lot that can be covered by hard surfaces — building footprints, parking areas, driveways, and sidewalks. The remaining area must be pervious: landscaping, green space, or pervious paving systems.
?
- ? Footprint of all structures ÷ lot area. Controls building bulk.
- ? All hard surfaces ÷ lot area. Drives stormwater retention requirements.
? C-2 has a maximum impervious surface ratio of 60%. Any impervious area above 60% requires on-site stormwater retention — typically wet detention ponds or underground exfiltration systems — designed per SJRWMD standards.
? On a 1-acre (43,560 sf) lot with 60% max coverage, you have 26,136 sf of impervious surface budget for your building footprint + parking. A 5,000 sf QSR building + 80 parking spaces (~26,400 sf) barely fits. Structured parking increases the FAR without consuming impervious budget.
?
- ? Footprint of all structures ÷ lot area. Controls building bulk.
- ? All hard surfaces ÷ lot area. Drives stormwater retention requirements.
? C-2 has a maximum impervious surface ratio of 60%. Any impervious area above 60% requires on-site stormwater retention — typically wet detention ponds or underground exfiltration systems — designed per SJRWMD standards.
? On a 1-acre (43,560 sf) lot with 60% max coverage, you have 26,136 sf of impervious surface budget for your building footprint + parking. A 5,000 sf QSR building + 80 parking spaces (~26,400 sf) barely fits. Structured parking increases the FAR without consuming impervious budget.
📐 Practical Example
43,560 sf lot × 60% max coverage = 26,136 sf max impervious area for building + parking combined.
How This Appears on ByRightHQ Zone Pages
On every zone detail page, ByRightHQ shows Lot Coverage / Impervious Surface data sourced directly from the county LDC. Terms like this one are underlined with a dotted line — hover to see the definition.
See C-2 Orange County FL → (example zone page)
Also known as:
lot coverage · impervious surface · building coverage · site coverage · ISR