C-2 · Orange Co., FL Code updated Jun 2025 GC · Maricopa, AZ Corridor expansion approved HC · Harris Co., TX Drive-thru stacking updated CB · Mecklenburg, NC FAR bonus program extended B-3 · Cook Co., IL CUP process streamlined BU-2 · Miami-Dade, FL Height limits amended C-2 · Fulton Co., GA Drive-thru by-right confirmed CS · Travis Co., TX New transit overlay effective CB · King Co., WA SEPA threshold raised M-1 · Duval Co., FL FAR increased to 0.50 MUDD · Charlotte, NC South End overlay expanded CG · Hillsborough, FL New drive-thru stacking rules C-2 · Orange Co., FL Code updated Jun 2025 GC · Maricopa, AZ Corridor expansion approved HC · Harris Co., TX Drive-thru stacking updated CB · Mecklenburg, NC FAR bonus program extended B-3 · Cook Co., IL CUP process streamlined BU-2 · Miami-Dade, FL Height limits amended C-2 · Fulton Co., GA Drive-thru by-right confirmed CS · Travis Co., TX New transit overlay effective CB · King Co., WA SEPA threshold raised M-1 · Duval Co., FL FAR increased to 0.50 MUDD · Charlotte, NC South End overlay expanded CG · Hillsborough, FL New drive-thru stacking rules
Abbreviation: ROW

Right-of-Way (ROW)

The strip of land dedicated for public use as a road, sidewalk, or utility corridor. Setbacks are measured from the ROW line, not the pavement edge.

Full Definition
The Right-of-Way (ROW) is the legal corridor of land dedicated for public transportation infrastructure — roads, sidewalks, bike lanes, and utility lines. The ROW width is typically wider than the pavement itself and is measured from property line to property line across the street.

? Setbacks are measured from the ROW line — not from the curb or edge of pavement. On a road with a 100-ft ROW, your property line begins 50 ft from the road centerline. A 25-ft front setback means your building is 75 ft from the road centerline.

?
- Narrower ROW = your property line is closer to the road = your site appears larger but setback math is the same
- FDOT/TxDOT arterials often have 80–120 ft ROW
- Local streets may have only 40–60 ft ROW

? When a county or city widens a road, they may require you to dedicate a strip of your property as additional ROW. This is called a "ROW dedication" and reduces your effective lot area — sometimes significantly on corner lots.
📐 Practical Example

A road with 100-ft ROW: your property line is 50 ft from road centerline. A 25-ft setback places your building 75 ft from centerline.

How This Appears on ByRightHQ Zone Pages

On every zone detail page, ByRightHQ shows Right-of-Way (ROW) data sourced directly from the county LDC. Terms like this one are underlined with a dotted line — hover to see the definition.

See C-2 Orange County FL → (example zone page)
Also known as: right-of-way · ROW · road right of way · public ROW